Sherwin-Williams

Protective & Marine Coatings

We are the exclusive provider of Sherwin-Williams' revolutionary fireproofing applications in the state of Texas

"The quality of the product looks outstanding. I'm impressed with the results and the finished look is great for exposed areas I am leaving uncovered."
jOHN jOINER
First-time user of Sherwin-Williams Fireproofing

Quality Tested

Extensively tested in laboratory settings on over 65 common industrial applications for proven results you can trust.  Sherwin-Williams fireproofing products meet all national and international standars for 2 and 4 hour fireproofing applications.

  • Effectively insulates steel from hydrocarbon fires (up to 4hrs)
  • Typically only requires 2 coats
  • Best-in-class properties regardless of how the coating was applied (plural PFP, single-leg airless RAM feed, or trowel)
  • Can be applied in shop or at site
  • Sherwin-Williams epoxy formulation protects from both fire and corrosion

FIRETEX® M90/03

FIRETEX M90/03 is a highly-reinforced, 100% solids, anti-corrosive epoxy intumescent coating from Sherwin-Williams, effective in mitigating fire risk up to 4 hours per UL 1709, revision 5. 

FIRETEX M90/03 requires no to low maintenance for the design life of the asset, making it the lowest lifecycle cost option.

information we need to determine your fireproofing

1. Hourly Rating desired (1 hour, 2 hour, 4 hour, etc.)

2. Steel shape (Beam, Column, Angle, C-Channel)

3. Column Tube Thickness (if columns are tubes)

4. Are Beams Restrained or Unrestrained?

5. Deck have poured concrete on it?

6. Steel Designation/Sizes for all structural members (ex. W10 x 49 [Beam or Column], HSS 10 x 8 x 1/4 [Tube Steel], etc.)

7. Lengths of the individual steel members, or a square footage of each (espeically important to determine gallons of fireproofing)

Read More

Shop-Applied Fireproofing beats field applications

Cost

Shop labor has advantages by controlling the environment and tools necessary for fireproofing. Shop teams can work more effiencntly, and produce higher quality coatings, and performall contributing to lower overall costs. through streamlined construction phases.

Quality

All processes effecting quality are improved in a shop environment.
Preparation of each steel member is easier and more refined

Aesthetics

Click edit button to change this text. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec mattis, pulvinar dapibus leo.

Time

Applications in the shop can be done in tandem with construction, rather than adding to potential delays at site. Time to completion can be considerably faster than a field applied fireproofing, especially considering some tools and containment systems required to coat steel that has already been erected. Typical containment systems for field application involve multiple, time intensive and cost prohibitavie systems.

Safety

Click edit button to change this text. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec mattis, pulvinar dapibus leo.

Learn more about Sherwin-Williams products

Visit Sherwin-Williams to find more details about these great

Image Source: Sherwin-Williams